Buscar en este blog

AYUDA A HACER ESTO MAS GRANDE DALE +1

miércoles, 5 de enero de 2011

horizontal and vertical drilling Byron Davenport

CONTENIDO

A TypicalOilandGasTransaction
The AFE
Drilling Contracts
The Drilling Prognosis
Key RentalItems
Rig-up, Spud-in,and Setting Surface Casing
Nippling Up the BOP Stack
Setting Up the Bottom Hole Assembly Drilling Out Surface Casing, Tests, and Squeeze Jobs
Drill Bits
TheMudProgram
Drilling Ahead
Produce-While-Drilling(PWD)Equipment
Key Maintenance
Special Problems During Vertical Drilling
Fishing Tools
Drill Stem Tests
Coring the Well
Logging the Welland
Accompanying Problems
The Intermediate String, Liners, and Testing
Finding the Horizontal Zone to Drill
The Horizontal Directional Drillerand MWD Tools
Drilling the Curve
Special Problems During Horizontal Drilling
Settingthe Packerin a Horizontal Well
The Long String and the Cement Job
Finishingthe Welland the Paperwork
Plug-and-Abandon Procedures
Blowout ContinIand Calculations
ComplEltinga Horizontal Well


link
http://www.megaupload.com/?d=R6OS18DU

No hay comentarios:

Publicar un comentario